Email Address

info@asiabana.com

Phone Number

+93 729888222

Working Hours

sat - thur: 09:00am to 07.00pm

Projects In Progress


Kamal Khan Flood Control & Hydropower Project Phase-III

Project Descripition

Kamal Khan Dam is located in Nimruz province 70 kilometer south-west of the provincial capital Zaranj and 15 Kilometer to the north of Charburjak district. The project includes construction of 1.6km long control dam, 540mlong reinforced concrete spillway, 3km long embankment sections, 44m long powerintake and powerhous complex for power generation and construction of irrigation outlets at both banks of the dam.

  • Allocated Budget: 78 Million USD
  • Duration: Three years
  • Prime contractor: Asia Bana, SAROL & PIMTEK JV
  • Consultants: AF-Consult India Pvt. Ltd., Mecamedi HPP india pvt ltd.
  • Client: National Water Affairs Regulation Authority (NWARA), Kabul Afghanistan.